Be agile. Respond to only genuine demand using DDMRP

Posted by Jonathon Vaiksaar on 03-Sep-2015 16:59:07

Material requirements planning (MRP) systems: 1950- conceived, 1960’s- codified, 1970’s- commercialised, 2015- minimal improvement since.

On the other hand, the environment of supply chains today have changed drastically compared to those of the past. Customer lead-time tolerance has decreased, sourcing has become ever more global and supply lead-times are increasing. The accuracy of forecasting is static at best, though often worsening due to unstable markets driven by promotional activity and high portfolio complexity. Given the increased pressure for return on assets, inventory and investment, it is understandable why so many are seeking alternative planning solutions.

Demand Driven Material Requirements Planning (DDMRP) is a methodology to decouple lead-times, delivering increased material availability whilst reducing working capital. It achieves this using strategically placed inventory buffers which then satisfy true demand without the input (and therefore error) of forecasts. The inventory buffers provide break points between each node of the supply chain, removing the conventional MRP dependancy on upstream lead-times.

One key difference between conventional MRP and DDMRP is that whilst MRP will try to net projected inventory or safety stock level (whichever is greater) to equate to 0, DDMRP does not project inventory and does not try to net stock to 0. MRP remains an appropriate tool when the lead-time for supply is shorter than the lead-time for demand, in this scenario MRP is the ideal just-in-time solution.


 In a DDMRP environment inventory buffers are placed where they will deliver strategic advantage by decoupling supply and demand and compressing lead-times. The decision of where to place strategic inventory buffers takes into consideration lead-time and the BOM matrix- identifies generic and semi generic materials decoupling.

Difference bettween DDMRP and MRP variation

Once the location of the buffers has been decided, the buffer profile and supply order generation point can be defined. The buffers are represented by 3 zones- Red, Yellow and Green.

DDMRP buffer zone definitions

Dynamic buffer adjustments are used to mitigate known future events by changing the size of the buffers to anticipate these events. For example, seasonal increase in demand or a capacity constraint.

With DDMRP supply orders only generated when the ‘available stock’ drops to the top of the yellow zone, a confirmed supply order will then forward scheduled based on the lead-time.DDMRP avaliable stock and on-hand stock

‘Available stock’ is not the same as available inventory as seen in most MRP solutions. Available inventory in MRP typically represents the pyhsical stock on-hand at the location. ‘Available stock’ in DDMRP is the on-hand stock + all confirmed open supply orders – confirmed demand (Past due +  due today + order spikes).

DDMRP planning provides a simple visual planning solution which enables a focus on exceptions and priorities. As in the diagram above, planners can simply review the position of ‘available stock’ or ‘on-hand’ against the buffer zones. Where the prioritisation of supply orders is required planners can compare on-hand and available stock against the buffers zones, prioritising the lowest ‘available stock’ as a % of the buffer over those with a higher % against the buffer.

SAP now provides solutions in S/4HANA and SAP IBP. In addition Olivehorse have built a DDS&OP solution. More information on this can be found here: https://olivehorse.com/expertise/demand-driven-mrp/

Our in depth expertise combined with extensive experience in SAP and DDMRP will ensure a seamlessly integrated solution addressing your business needs.